Automotive Electronics

Rotating transformer assembly

Consult

Station description:

Pin/test unit

Winding machine unit (5 stations)

Manual code scanning online unit

CCD lead test/stress release unit

Terminal resistance welding unit (including buffer station)

CCD detection unit after welding

Electric heating unit (including buffer&reserved station)

Cooling unit (double station)

Electrical performance test unit

Manually pre-install connector unit (including reserved station)

Connector CCD detection/compression unit

Connector resistance welding unit (including reserved station)

High voltage test unit

CCD test unit after welding

Manually pre-install the upper cover/visual inspection unit after welding

Upper cover pressing unit

EOL test unit (including buffer station)

Laser coding unit

Offline unit

Manual processing unit


Main paraMeters:

-Beat time: 20 seconds

Yield rate of production line: ≥ 99%

Production line efficiency: ≥ 90%






Application