Basic process: including cell loading, cell testing, cell cleaning, support equipment, heating and curing, cell stacking, CCS assembly, CCS welding, air-tight test, electrical performance test, module packaging, PACK component installation, liquid-cooled plate installation, EOL test, PACK charge and discharge test, PACK air-tightness test, packaging offline.
Basic process: including cell loading, cell testing, cell cleaning, support equipment, heating and curing, cell stacking, CCS assembly, CCS welding, air-tight test, electrical performance test, module packaging, PACK component installation, liquid-cooled plate installation, EOL test, PACK charge and discharge test, PACK air-tightness test, packaging offline.
Core technology: It can be compatible with the requirements of assembling multiple cell products into modules/PACK, and the production line needs to meet the different assembly requirements of multiple modules/PACK products
Introduction to thread body:
The whole line has the functions of core online, core OCV test&cleaning, coil correction, coil coating, Cell-Block assembly, Cell-Block heating and curing, module stacking, tray cleaning&gluing, tray and module assembly, module heating and curing, CCS component installation, Busbar welding&inspection, FPC installation, FPC welding, module EOL test, module top gluing, module top cover installation, module pressure maintaining, module offline inspection, etc.
Line body equipment paraMeters:
Line body area: 57500 × 7600X2800(mm)
Energy consumption: 450KW/piece
Equipment capacity: 100PPM/piece (cell)
Crop rate: ≥ 80%
Equipment yield: ≥ 99%
Single-line production personnel: ≤ 17
Compatible switching time: ≤ 2h
Switchboard: 0512-62981499
Fax: 0512-62981525
E-mail: tech-shine@tech-shine.com.cn
Address: No. 938, Chengyang Road, Economic Development Zone,
Xiangcheng District, Suzhou, Jiangsu Province
Focusing